Gutor is a leading international manufacturer of UPS systems for industrial applications. With over 75 years of experience, the company has established a reputation for delivering high-quality products and services.
Project Engineer Responsibilities
* Design and technical documentation of uninterruptible power supply (UPS) systems throughout the project contract duration.
* Develop technical solutions tailored to customer needs while ensuring quality and cost efficiency.
* Serve as primary point of contact for technical questions from customers and all project stakeholders.
Solution Support
* Review Technical Specifications: Assess and analyze customer technical specifications to ensure compliance and feasibility.
* Technical Clarification and Deviation: Address and clarify technical questions and manage deviations from standard practices.
* Evaluate Technical Customer Requests: Assess and respond to customer technical inquiries and requests.
* Customer Support: Responsible for addressing technical customer queries.
Solution Design
* UPS Configuration: Oversee the UPS configuration and detailed design according to customer specifications, Gutor processes, and defined standards.
* Cost Optimization: Develop cost-optimized engineering solutions while maintaining high quality.
* BOM Creation: Design and create the BOM for the UPS using available engineering tools.
* EPLAN Design: Utilize the EPLAN or similar engineering tool for UPS design, including drawings and BOM.
* Technical Documentation: Prepare project-specific technical documents, including technical data, test documents, and calculations.
* PLC Programming: Program PLCs for special features.
* Manual Preparation: Draft non-standard instructions for manuals.
3rd Party Supplier Management
* Technical Clarification and Order Placement: Manage technical clarifications and place orders (UNC/Purchase Requisitions) with third-party suppliers.
Operations Support
* Assembly Documentation: Prepare assembly documentation (BB-Blue Binder).
* Test Bay Documentation: Prepare test bay documentation (GB-Green Binder).
* Change Instructions: Draft Change Instructions (CI).
* Shop Floor Support: Provide support to assembly and test bay operations on the shop floor.
* System Release: Conduct the system release.
Inspections
* FAT Support: Assist the Project Manager during the Factory Acceptance Test (FAT) regarding specific technical aspects.
* Modifications Initiation: Initiate modifications through Change Instructions (CI) resulting from FAT or Field Inspections punch items.
* Field Inspections: Troubleshoot and resolve any equipment-related issues that arise during inspections (DNV, ABS, CSA, etc.).